Name of Equipment: Horizontal Raise Borer (HRB)
Shaft Diameter: 4,5 meters
Purpose: Complex is used for creating horizontal under cuts and travel way tunnels in a fast and cost-effective manner where access is available on both ends
Benefits: - No blast materials used
- Continuous production process
- Strong circular structure of the tunnel
- The Complex is smaller and such easier to transport
- More cost effective than a TBM
- Less support needed than conventional drill and blast tunnels
- Reaming advance of 4,5 meter per day
- Hard rock drilling application